I have a docusign document (lease) that needs dating.
In some of the definitions, the text boxes have been missed therefore I won’t be able to add in the relevant information in docusign at the time of dating. I can edit the pdf immediately after to add those in, but do I need to add a statement on the front page that advises that has been done?